![]() The success criteria for the UFT that are identified in the Statement of Work (SOW) only include a landing test to the lunar surface with a demonstration of precision landing capabilities. The proposed solution to maturing these technologies is a significant strength of the technical proposal because it is highly advantageous to NASA in terms of maintaining schedule and ensuring mission success, and there is no financial impact to NASA because the pathfinder missions are being funded by Blue Origin.īlue Origin’s technical approach is the plan to burn down risk associated with the crewed demonstration mission by using a fully integrated flight configuration of all systems for the Uncrewed Flight Test (UFT), which is conducted before the crewed demonstration mission. It is a forward-thinking solution to mature key low-TRL technologies allowing for incorporation for any changes into the final design well in advance of the LOCR and crewed demonstration mission. Specifically, Blue Origin planned to fund and execute pathfinder lander missions in 20, to land on the Moon to mature several critical, lowTRL technologies three years before the Sustaining Lunar Development (SLD) uncrewed demonstration mission by demonstrating lunar lander components, subsystem designs, and system behaviors. ![]() To facilitate Blue Origin’s ability to successfully complete the required Lunar Orbit Checkout Review (LOCR) and crewed demonstration mission in 2028, Blue Origin proposed a unique and highly advantageous aspect of its technical approach that matures several technologies critical to the success of the crewed and cargo landers early in the development cycle to burn down risk associated with the current low-Technology Readiness Levels (TRLs) of multiple technologies. The purpose of this solicitation is to request proposals from industry for selection and a second award for the rapid development and demonstration of a Sustainable Human Landing System (HLS) from a second provider, delivering humans to the lunar surface in a subsequent Artemis mission, and with the requirement of completing the required Lunar Orbit Checkout Review (LOCR) by April 2028. NASA exercised an option for a contract in December 2022 under the Next-STEP-2 Omnibus BAA for a sustainable lander known as Option B, which will serve notionally as the lander for the Artemis IV mission. Those companies lost to SpaceX in their 2021 bid, which Blue Origin unsuccessfully tried to have overturned in court. ![]() Blue Origin will build a 16-metre (52-foot) tall lander in coordination with defence contractors Lockheed Martin and Boeing, as well as spacecraft software firm Draper and the robotics company Astrobotic. The contract requires Blue Origin to offer a demonstration of an uncrewed mission to the moon, followed by a crewed voyage that would take astronauts to the lunar surface, scheduled for 2029. On NASA selected Jeff Bezos’s company Blue Origin to construct a spacecraft that will send astronauts to and from the surface of the moon, winning a contract valued at about $3.4bn. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |